2027 sourcing report
Solar Procurement 2027
Fulfilled-order insights and practical buying guidance for 2027.
- Fulfilled orders
- 864
- With modules
- 54.9%
- Median module line
- 62
Methodology
Closing dates: November 27, 2024 through November 27, 2026. Fully delivered and self-pickup/delivered records only; test, partial-delivery and damaged records excluded. 868 line records were grouped by deal reference into 864 orders. 474 orders contained a panel/module line. The median uses 462 positive panel/module quantities; selling-unit conversions are not inferred. Latest recorded closing date: August 30, 2026. These are Sunhub records, not an industry survey or a prediction of 2027 activity.
One request. Clearer quotes.
Send every supplier the same specifications and commercial requirements.
- Exact models, ratings and acceptable alternatives
- Quantity and selling unit, including items per pallet
- Delivery ZIP, need-by date and unloading access
- Warranty, certifications and payment terms


Better inputs. Less rework.
Three ways to prepare a clearer request.


Check documentation
Organize domestic-content inputs and request the evidence your project needs.
Check content
Source with a clear brief.
Four practical steps for your next supplier request.
- Buying patterns from fulfilled orders
- Quote-ready specifications and quantities
- A consistent delivered-cost comparison
- Stock, unloading and documentation checks
Common questions
How early should I source?
Send your source request when the BOM and installation schedule are defined. Ask each supplier for stock confirmation, dispatch timing and transit separately. Availability and delivery dates are quote-specific, not guaranteed by this report.
Can I request bulk pricing?
Yes. Include the model, wattage, item count and number of pallets or containers. Ask for the quantity per selling unit and the minimum order, so every quote covers the same shipment.
Which certifications do I need?
Request the exact model datasheet, applicable safety and grid certifications, warranty terms and any domestic-content or FEOC evidence your project needs. Your engineer and tax adviser should confirm eligibility; a listing or calculator is not a certification.
Does price include freight?
Not always. Check pickup versus delivered terms. Where a freight estimate is available, select your delivery state and compare the shipment total, per-item cost and, for modules, delivered price per watt. Confirm the final delivery ZIP, unloading access and charges in the quote.
How do supplier quotes arrive?
Post one source request with specifications, quantity, delivery location and timing. Sunhub reviews the request and coordinates supplier responses. Review pricing, availability and commercial terms with your assigned account manager before committing.
Policy context: SEIA's FEOC and domestic-content discussion. Procurement guidance only, not legal or tax advice.
Source your next project.
Bring the equipment list. Get supplier quotes.